In Design: Richmond Mayo's Bridge Superstructure Replacement
Cost and schedule ►
Public outreach ►
The purpose is to replace the existing Mayo's Bridge superstructure. VDOT is currently evaluating the existing piers to determine replacement options.
Benefits
Proposed improvements will extend the life of Mayo's Bridge.
Resources
              
                    William Wheeler, Project Manager
                    804-609-5280
                    
Other relevant links:
Phase: In Design
UPC: 104888
State ID: U000-127-860
Federal ID: RSTP-5A27(564)
                Lat/Long: 37.530911478758625, -77.43348956647425
                
              
              
                
                
                Locality:
                
                Richmond
                
                
                
                
            